BullParkItBullParkIt
Login
Free Concrete Coating Contractor Tool — No Login Required

True Epoxy & Polyaspartic $/Sq.Ft. Cost, Warranty & Kit Calculator

Charging just “kits + wages” leaves zero dollars for diamond wear, commercial truck insurance, planetary grinder servicing, or 10-year peeling callbacks. Calculate your exact bare-minimum floor, material shopping list, and local market expansion rate below.

Step 1: Pick Your Shop & Equipment Rig Baseline (Adjust Every Cost Below)
Combined Crew, Shop Overhead & Grinding Sliders
All-In Daily Crew Wages, Burden & Truck Fuel$610/day
Monthly Fleet Leases, Insurance, Office, Ads & Tool Breakage$12,550/month
Per-Job Grinding Diamonds, Rollers & Prep Supplies$152/garage
Supplier Kit Prices & Instant Job Shopping List

Enter what your supplier charges you per kit/box, then test any job size below to see exact kits needed.

Live Sample Job Material Shopping List
sq.ft.
2 × 3-Gal Kit — 100% Solids Epoxy Base (3-Gal Kit)$223
1 × Tint Pod — Universal Polymer Liquid Tint Pod (~1/3–1/2 Pod / Kit)$11
2 × 40-lb Box — 1/4" Decorative Vinyl Flake (40-lb Box)$315
2 × 2-Gal Kit — 85% Solids UV Polyaspartic (2-Gal Kit)$458
1 × 4-Gal Pail — Polymer Anti-Slip Topcoat Additive (4-Gal Pail)$4
1 × 2-Gal Kit — Polyurea Crack Filler (2-Gal Kit)$20
1 × Job Pack — Disposables & Solvents Pack (Rollers, Pails, Spikes + Xylene/Acetone/ISO)$68
Total Supplier Material Cost (440 sq.ft. w/ waste):$1,099
Warranty Reserve, Profit & Expansion Sliders
Warranty Self-Insurance Reserve (5–15 Yr Callback Fund)4.0% ($22,957/yr banked)
Mandatory Company Net Profit14.5% ($83,218/yr)
Business Growth & Marketing Allocation4.0% ($22,957/yr growth fund)
Your Certified Profitable Garage Flake Rate
$8.50 / sq.ft.
ZERO-PROFIT FLOOR
$6.90/sf
DAILY MINIMUM
$2,500
Status: Healthy Market Sweet Spot — Competitive & Profitable
• Warranty Reserve Banked: $22,957/yr
• Annual Growth & Ad Capital: $22,957/yr
14-day free trial • Embeds on your website to pre-qualify homeowners & auto-calculate kits on every lead!

The Complete Contractor Guide to Pricing Epoxy & Polyaspartic Floors Per Sq.Ft.

Why do busy 1-rig installers work 60 hours a week yet end the season with an empty bank account? Because most calculators ignore the 6 hidden costs of concrete coating.

1. Why You Must Charge for Your Warranty

Resin manufacturers only warrant liquid defects in the bucket—never hydrostatic moisture vapor, hot-tire pickup, diamond segments, or your crew's labor to strip and recoat a 400 sq.ft. 2-car garage. Setting aside 3%–5% of every jobbuilds a dedicated self-insurance pool so honoring a 10-year warranty never wipes out a week's pay.

2. Equipment Servicing, Insurance & Winter Days

Planetary grinders eat bearings, belts, dust skirts, and metal-bond diamonds, while commercial truck/trailer policies and heated resin storage bill 12 months a year—even when snow shuts down unheated garages. Divide 12 months of overhead by realistic billable days (140–150 days in Canada/Northern US, not 365).

3. Charging Market Price to Fund Expansion

Smaller shops pay higher per-kit prices than pallet buyers, while larger fleets carry heavier overhead—which is why GTA & major metro market prices settle around $7.00–$9.50/sq.ft. Charging healthy market rates and allocating 6%–10% annually to marketing and equipment is the only mathematical path off a single grinder.